Go back

All Entries

Welding on Forward Main Deck. 16 inch gun Turret 1 & superstructure begins to take shape further aft. October 1942 - 80-G-K-510
Welding on Forward Main Deck. 16 inch gun Turret 1 & superstructure begins to take shape further aft. October 1942 - 80-G-K-510
Photograph
A welder constructs the face of one of IOWA
A welder constructs the face of one of IOWA's 16 inch gun turrets. October 1942 - 80-G-K-509 also 80-G-K-512
Photograph
A crane hosts a 16 inch gun barrel onto IOWA for installation. Note the two stacks in the background. Fall 1942 - 80-G-K-513
A crane hosts a 16 inch gun barrel onto IOWA for installation. Note the two stacks in the background. Fall 1942 - 80-G-K-513
Photograph
An overhead crane lowers a prefabricated structure onto IOWA for installation. Fall 1942 - 80-G-K-511
An overhead crane lowers a prefabricated structure onto IOWA for installation. Fall 1942 - 80-G-K-511
Photograph
IOWA
IOWA's Turret 2's side armor "skeleton" & guns being installed - note the superstructure in the background. Fall 1942 - 80-G-K-515
Photograph